Mechanical Projects

Mechanical and Electrical Upgrades @ Greenwood Elementary School

Approximate Cost - $3.5 million

Owner - Hamilton Township BOE

Location - Hamilton, New Jersey

Project Type - Educational

Completion - October 2023

Project Overview - This project included the replacement of the school’s steam boiler system with a hot water boiler system, unit ventilators and convectors. Kappa also installed a VRF system for the administrative wing, (14) exhaust fans, (3) RTUs, (20) ceiling fans and associated ceiling fan pockets and ceilings throughout common areas and offices. 

    Children's Learning Center Mechanical and Fire Protection Systems Replacement @ Brookdale Community College

     

    Approximate Cost - $900,000

    Owner - Brookdale Community College

    Location - Lincroft, New Jersey

    Project Type - Educational

    Completion - July 2023

    Project Overview - This project included the replacement of 5 DX/Duct Furnace systems with a full-building VRF system and associated Duct Furnaces in addition to the replacement of the full-building fire suppression system, sewer grinder pump and exhaust fans. 

      Robbins Elementary School HVAC Improvements

      Approximate Cost - $8 million

      Owner - Trenton BOE

      Location - Trenton, New Jersey

      Project Type - Educational

      Completion - April 2023

      Project Overview - This project included the replacement of a steam boiler system with VRV and DOAS systems. This project was one of Oxygen-8’s first DOAS x VRV installations in the country.


      The architectural work on this project included sawcutting of shafts for ductwork, abatement and installation of GWB soffits and acoustical ceilings in common areas and offices.

        Mechanical Ventilation and Ionization Upgrades to the Woodrow Wilson Elementary School

        Approximate Cost - $1.5 million

        Owner - Neptune City School District

        Location - Neptune City, New Jersey

        Project Type - Educational

        Completion - December 2022

        Project Overview - This project included the installation of 4 office split systems and replacement of classroom unit ventilators and associated condensing units with new including the replacement of old refrigerant piping that utilized R-22 refrigerant.

          HVAC Renovations at the Port Colden Elementary School

           

          Approximate Cost - $1 million

          Owner - Washington Township Board of Education

          Location - Washington Township, New Jersey

          Project Type - Educational

          Completion - August 2022

          Project Overview - This project included the replacement of classroom unit ventilators and installation of associated condensing units and refrigerant piping in addition to the installation of a new gym rooftop unit and associated gas piping and the replacement of a large air handler serving the basement area.

            HVAC upgrades @ LES & TJMS

            Approximate Cost - $3 million

            Owner - Rockaway Borough Board of Education

            Location - Rockaway, New Jersey

            Project Type - Educational

            Completion - October 2021

            Project Overview - This project included HVAC Upgrades at two schools: Lincoln ES & Thomas Jefferson MS. Kappa Construction completely demolished the aging steam heating system at LES and replaced it with a high-efficiency hot water heating system complete with a brand new boiler plant and unit ventilators with matching metal shelving in each classroom. Thomas Jefferson MS included the replacement of the old boiler room equipment with a modular boiler/pump skid, as well as replacement of classroom unit ventilators and fin tube enclosures.

              hvac upgrades @ keyport central school

              Approximate Cost - $7 million

              Owner - Keyport Board of Education

              Location - Keyport, New Jersey

              Project Type - Educational

              Completion Date - October 2019

              Project Overview - This project included the removal and replacement of boiler plant piping and specialties for (3) boilers, replacement of (1) boiler, installation of HW/DX self-contained UVs, rooftop units and split systems. This project included a significant amount of asbestos abatement and classroom shelving as well as flooring and ceiling replacements.

                HVAC Upgrades @ South Plainfield MS

                Approximate Cost - $3.3 million

                Owner - South Plainfield Board of Education

                Location - South Plainfield, New Jersey

                Project Type - Educational

                Completion - October 2018

                Project Overview - This project included the conversion of an existing steam boiler plant into hot water heat using a new heat exchanger plant as well as all new hot water piping in the crawl space beneath the school. Each classroom received a new unit ventilator and associated condensing unit, with larger communal spaces being served by new rooftop units. Kappa Construction installed 57 unit ventilators & associated condensers, 27 rooftop units, exhaust fans and cabinet heaters.

                  hvac upgrades @ raritan high School & Cove Road School

                  Approximate Cost - $2.5 million

                  Owner - Hazlet Board of Education

                  Location - Hazlet, New Jersey

                  Project Type - Educational

                  Completion - October 2017

                  Project Overview - This project included the installation of 22 VRF systems consisting of 162 evaporators and 22 condensing units. Other equipment installed as part of this project include: 4 RTUs, miscellaneous split systems and fans.

                  This project is featured as part of Inaba-Denko's AHR exposition for its use of RD-Slim Duct enclosures for all exterior refrigerant piping.

                    HVAC & Sprinkler Upgrades to Passaic County Jail - phase 2

                    Approximate Cost - $6 Million

                    Owner - County of Passaic

                    Location - Paterson, New Jersey

                    Project Type - Institutional Correctional

                    Completion - September 2016

                    Project Overview - Project included full HVAC, Electrical, and Sprinkler System overhauls to the Main and Marshall Street complex facilities within the Passaic County Jail.

                      Perth Amboy HS HVAC Upgrades

                      Approximate Cost - $5.5 million

                      Owner - Perth Amboy Board of Education

                      Location - Perth Amboy, New Jersey

                      Project Type - Educational

                      Completion - October 2015

                      Project Overview - Kappa Construction installed a state-of-the-art chilled water plant consisting of two chillers, a pre-manufactured pump house and 11 partially-buried ice-storage tanks. This project also included the installation of 22 VRF systems, consisting of 41 condensing units and 210 evaporators. Other equipment installed as part of this project: 72 exhaust fans, 7 replacement heating coils and 3 air handlers.

                      General construction associated with this project included excavation and trenching to allow for partial burial of ice-storage tanks, concrete and steel installation for chiller & pump house installation and new asphalt paving in this area. 

                      This project was featured in ASHRAE's April 2016 Thermogram that included a tour of the facility with local industry leaders.